If one has never seen the grand sight of the mountain
He must be at the top of it
If one has never felt the vastness of the sea
He must be a broad-minded person
DLT Technology
Big Platform, New Standard, Ever Lasting
Backed up with the power of HLT brand
With a grand global market vision
Devoted to setting up a new standard of ‘Made in China’ with ‘LT Specialities’
Founded in 2016
To take off in 2022
May 15, 2022, the 6th Anniversary of DLT
Six years passed, while dreams are going on
DLT people
Fighting from competition in the industrial environment
Cultivating the brand with wisdom and sweat
Telling a legendary story of intelligent complete plant equipment for ceramic industry
2200 days and nights
With footprints in more than 30 countries and regions
On more than 200 overseas construction sites
To build more than 280 excellent projects across the world
Kilns and complete plant turn-key project equipment
International top class brand legend
Globalized work team with independently-developed leading technologies
Featuring a profound LT culture heritage
From DLT into LT Brand
From individual machines into complete plant projects
Implementing LT’s globalization development blueprint to reality
2016
★DLT Technology Co., Ltd Groundbreaking Ceremony;
★The first domestic contract signed with Letou(Jiangsu);
★The first overseas contract signed with RICH VITRIFIED in India;
★DLT first complete plant project for water permeable tiles was put into service successfully in Greenland(Jiangsu);
★The first GVT line for Dehuilai Ceramic (Shandong) launched production;
2017
★The first complete line supplied by DLT to India was put into service successfully in Rich Granito, creating a new lowest record on energy saving in Indian market;
★The world first double-deck kiln with 3500mm width was put into service successfully in Fulaite Ceramic Manufacturing Co., Ltd(Shandong);
★New Factory construction successfully completed;
★The first Slab Production line was put into service successfully at SLIM in India
★The first atmosphere-protected electric roller kiln for lithium material supplied to Kanhoo Industry Co., Ltd.(Jiangmen) was successfully put into service;
2018
★First China-made seven-layer dryer was successfully put into service at Bravat in India;
★The first double-deck roller kiln was successfully put into service at SEVENZA CERAMIC in India;
★First double-deck tunnel kiln for foamed ceramic was put into service successfully in the production base of Hanking Group(Liaoning);
★The first super-wide kiln for slabs was successfully put into service at JUNTAO(Fujian);
★First high temperature tunnel kiln for alumina balls was successfully put into service in FCRI (Pingxiang);
2019
★The first sanitaryware complete production line was successfully put into service at LODO(Henan);
★The first tunnel kiln for tableware supplied to Indonesia was put into service successfully in the production unit of PT Semesta Keramika Raya;
★Overall gas consumption for polished glazed vitrified tiles achieved between 1.55-1.6Nm³ at MONALISA Qingyuan Base, lowest in the industry for the similar products;
★The industry’s first microporous water permeable brick complete line put in service at Jingshuo(Jiangxi), having solved the coarse pore blockage problem with ordinary water permeable bricks;
★The first shuttle kiln for tableware was successfully put into service at FIRECLAY FACTORY LLC in U.A.E;
★The overseas market longest in length and largest in output floor tile wide-body kiln was successfully put into service at Mulia in Indonesia;
★The first China-made sanitaryware tunnel kiln was successfully put into service at KAJARIA Group in India;
★The first triple-layer tunnel kiln for foamed ceramic was put into service successfully in the factory of Zhongcai(Jiangxi);
★Phase 1 of Monalisa (Guangxi) production base new GVT project Kiln F and Kiln G achieved record of lowest gas consumption of super-length kiln;
2020
★The first thick tile (5-6.5cm) tunnel kiln contract signed with SAXA GRES in Italy;
★The first sanitaryware complete line turnkey project contract signed with UHG in Ghana, Africa;
★The first China-made super-wide(W3950) wall tile kiln was put into service successfully at ALFANSO in India. It can be loaded with 12 pieces of 300x450 mm or 300x600 mm interior wall tiles, which is 1.2 times output than the same length (W3400) kilns and its energy consumption can be reduced by at least 20%;
★Southwestern China’s first kiln for 3mm thickness ultra-tough sintered slabs was successfully put into service in the production base of Sunseast Ceramics;
★The first full function and fully computer controlled intelligent sintered slab kiln was successfully put into service in NJC(Guangdong);
★The first energy-saving tunnel kiln for refractory material launched mass production in the factory of Trend Technology Co., Ltd(Shandong);
★China’s first super-wide kiln(W3300/L308.7M) for sintered slabs, which can feed 2700mm-wide sintered slabs in transverse direction, was put into service in Summit Ceramics’ Lubu production base.
★The first large sintered slab production line contract signed with HONGYU Group;
2021
★The first large output GVT wide-body firing kiln (3050/L480.9) was put into service successfully in MARCO POLO (Chong Qing);
★‘4.0 Energy Efficiency Benchmark Digitized and Intelligent Technology’ double-deck single firing wall tile production line started up in Algeria;
★The largest double firing wall tile new production line in Vietnam was successfully put into service in benchmark company VTC;
★The world’s longest Carbonneutral Series double-deck sintered slab kiln with largest output started up in NEWPEARL Ceramic Group;
★Wall tile and floor tile production line turnkey project with the largest output in Bangladesh was successfully put into service in MGI- Fresh Ceramic;
★Sanitaryware tunnel kiln with the largest output in Bangladesh was successfully put into force in Akij Ceramic;
★5G Carbonneutral Series double-deck sintered slab kiln started up in OCEANO Ceramic (Guangdong);
★First Chinese standard ‘4.0 Energy Efficiency Benchmark Digitized and Intelligent Technology’ double-deck kiln was successfully put into service in Algeria;
★Gas consumption of Guangda (Fujian) Phase 1 and Phase 2 ecological slab production lines, around 2.2 Nm³/m² natural gas, reached a new milestone for ecological slab production in the industry;
★Jointly initiated by Foshan Xianhu Laboratory, OCEANO Ceramic Group and DLT Technology Co,. Ltd.: The first domestic innovation platform for the green energy industry of zero-carbon combustion technology of ammonia-hydrogen high-temperature kilns - advanced zero-carbon combustion Technology Joint Innovation R&D Center was established in Foshan Xianhu Laboratory;
2022
★America’s first ‘4.0 Energy Efficiency Benchmark Digitized and Intelligent Technology’ ceramic production line started up in Columbia;
★First single firing floor tile complete production line was successfully put into service in Uganda;
★First single firing floor tile complete production line was successfully put into service in Kenya;
★First double firing complete production line(daily output 68,000 m²) contract signed in Nigeria.